Seedance 2.0
A concrete platform on a rocky shore is dismantled step by step, with materials sorted and hauled away in a time-lapse video
Prompt
Fixed-camera wide-angle timelapse, fully documenting the entire process of a building’s construction from an empty plot to completion. The camera remains fixed throughout; the pace of construction is conveyed solely through time compression (10–30x fast-forward). Natural light can be seen cycling through the frame (early morning→noon→dusk→night). Phase 0|Empty starting point An open, level plot of land, with survey stakes and layout lines visible on the ground. Construction equipment has not yet arrived; the background environment (mountains/sea/city skyline) is clearly visible and is the only stable, unchanging element throughout the video. The static shot lasts 3 seconds. Phase 1|Site preparation and foundation work Excavators and bulldozers arrive quickly, construction fencing is erected, and safety signs are put in place. Excavators dig the foundation trenches; loaders scoop up the excavated soil, transport it, and pile it on one side of the site. Rebar mesh is quickly laid and assembled in the excavation; a concrete mixer truck drives in, pours the concrete, and the surface is smoothed. The foundation outline gradually becomes clearly visible in the frame. Phase 2|Rising main structure Scaffolding rapidly climbs upward from the ground, like a growing skeleton. Concrete columns and floor slabs are poured one level at a time; after each level is completed, the building visibly grows taller—rising in distinct steps, not as a continuous ascent. A crane rotates continuously, precisely lifting rebar, formwork, and concrete components to the work floors. The materials storage area remains visible beside the building; the material piles grow and shrink as work progresses. Phase 3|Enclosure and exterior wall installation Once the floor slab structure is complete, exterior wall materials begin to be installed: Brick-and-concrete structure: workers lay bricks level by level, and the walls rise rapidly Glass curtain wall: a crane lifts entire glass units, and workers align and secure them Wooden exterior walls: workers assemble the components one by one, fitting the wooden boards in sequence Stone exterior facade: cut stone slabs are lifted into place, adhered, and pressed firmly The exterior walls gradually “fill in” the transparent building frame, and its outline becomes increasingly distinct. Phase 4|Roof completion The roof structure is installed with the workers’ help: the waterproofing layer is unrolled, the insulation layer is laid, and the finish materials are fitted into place one piece at a time (tiles/metal roofing/flat-roof surfacing). Closing in the roof marks the completion of the building’s main form, revealing its full outline for the first time. Phase 5|Window and door installation and MEP services Window and door frames are precisely fitted into the openings, and workers slowly position the glass with lifting equipment. At the same time, electrical conduits, water pipes, and air ducts are quickly routed inside and outside the walls, like blood vessels extending through the building. Electrical equipment and bathroom fixtures arrive and are installed in sequence, rapidly transforming the interior from an empty shell into a functional space. Phase 6|Interior finishing and exterior closeout Flooring, wall paint, and suspended ceilings are completed gradually, with each space transforming in turn from a bare shell into a fully finished room. Exterior work advances at the same time: facade trim is completed, exterior walls are painted with rollers or clad, and window sills are capped. The texture of the building’s surfaces gradually becomes more refined. Phase 7|Landscaping and site completion The construction fencing is removed, and construction equipment drives away one vehicle at a time. Landscaping vehicles arrive: topsoil is spread, a crane lowers trees into planting pits, shrubs rapidly cover the ground, and the lawn is laid in sections. Hardscape paving (stone/wood planks/concrete) is fitted together piece by piece. Lights, signs, and site fixtures are installed in sequence. Phase 8|Completed building The last construction vehicle drives away, and the site is restored to a clean, orderly state. The building stands complete: the facade is clean and polished, the landscape is lush and green, and the lights come on. The static shot lasts 5 seconds. The background environment (mountains/sea/skyline) remains exactly as it was at the beginning, unchanged. The frame freezes—an empty lot becomes a building, witnessing the birth of a home. Technical parameters Camera: fixed wide-angle shot, framing the main building, adjacent materials storage area, and vehicle access route Style: construction documentary, ultra-clear 4K, industrial color grading→warm tones upon completion Time compression: 10–30x speed, with mechanical movements remaining legible Audio: construction sounds (roaring machinery, clashing rebar) fast-forwarded→transitions to ethereal instrumental music upon completion No watermark, no subtitles, no text overlays Precision deconstruction: orderly deconstruction timelapse of [building name in reference image], type: precision building deconstruction timelapse / fixed-camera reverse-recorded sequence, duration: high-speed reverse-evolution sequence (full, orderly deconstruction cycle), core_principle: No magical transitions. Use fast-forward to show the real process of orderly mechanical and manual dismantling, material stacking, transport, and site cleanup. Absolutely no uncontrolled shots of collapse, explosions, sudden disappearance, or similar events. All dismantling must be controlled, step-by-step, and carried out as orderly construction work. demolition_methodology: industrial-grade precision deconstruction: coordinated manual and mechanical work→dismantling piece by piece→sorting and stacking→systematic transport→site clearance reference_image_analysis: instruction: deeply analyze the user-provided [reference image], silently record all key architectural details, and use them as the 100% accurate starting state for the deconstruction analysis_checklist: [architectural style (modern/traditional/mixed/tropical/industrial, etc.), number of floors and overall scale (single-story/multistory/villa/mansion), main structural system (timber/concrete/steel/brick and concrete), exterior facade materials (wood/stone/glass/concrete/metal/paint), list of dismantlable components (roof/windows and doors/exterior wall panels/floor slabs/columns and beams, etc.), estimated materials (how many cubic meters of timber/steel/concrete blocks need to be stacked, etc.), deconstruction difficulty assessment (which parts require a crane/which can be dismantled by hand)] initial_state_lock: Phase 0 must reproduce the completed state in the reference image with 100% accuracy, as the starting point for orderly deconstruction narrative_timeline: [Phase 0: completed state (pre-deconstruction preparation), Phase 1: deconstruction preparation and landscape removal, Phase 2: removal and transport of interior items, Phase 3: first batch of materials transported (partially clearing the storage area), Phase 4: removal of windows, doors, and special components, Phase 5: removal of exterior wall materials, Phase 6: large-scale transport of the second batch of materials, Phase 7: deconstruction of the main structure (orderly dismantling from top to bottom), Phase 8: foundation removal and material clearance] - Each phase contains detailed visual descriptions, motion_style, key_action, material_flow, and importance/emphasis notes. The prompt details the entire process from the initial completed building state through systematic deconstruction, material sorting and removal, and final site clearance, emphasizing controlled deconstruction methods that avoid magical transitions or collapse scenarios.
固定机位广角延时摄影,完整记录一座建筑从空白地基到竣工落成的全过程。镜头始终固定,仅通过时间压缩(10-30倍速快进)呈现建造节奏,可见自然光在画面中循环更替(清晨→正午→黄昏→夜间)。 Phase 0|空白起点 空旷平整的原始场地,地面可见测量桩和轮廓放线。施工设备尚未进场,背景环境(山/海/城市天际线)清晰可见,是全片唯一不变的稳定元素。静止画面持续3秒。 Phase 1|场地准备与基础施工 挖掘机、推土机快速进场,围挡搭建,安全标识就位。挖掘机开挖基槽,土方被装载车铲起、转运、堆放至场地一侧。钢筋网在基坑内快速铺设成型,混凝土搅拌车驶入、浇筑、抹平。地基轮廓在画面中逐渐清晰。 Phase 2|主体结构生长 脚手架从地面快速向上攀升,如骨架生长。混凝土柱和楼板逐层浇筑,每一层完成后建筑整体明显升高——呈现阶梯状上升节奏(非连续飞升)。吊车持续旋转,将钢筋、模板、混凝土构件精准吊至作业层。材料堆放区在建筑旁侧始终可见,材料堆随作业进度此消彼长。 Phase 3|围护与外墙封闭 楼板结构完成后,外墙材料开始安装: 砖混结构:工人逐层砌砖,墙面快速升高 玻璃幕墙:吊车吊起整块玻璃单元,工人对位固定 木质外墙:工人逐块拼装,木板条按顺序覆盖 石材外立面:切割好的石板被吊装、粘贴、压紧 建筑从透明骨架逐渐被外墙"填满",轮廓日益清晰。 Phase 4|屋顶完工 屋面结构在工人配合下完成铺设:防水层展开、隔热层覆盖、面层材料逐块就位(瓦片/金属屋面/平屋顶铺装)。屋顶封闭标志建筑主体形态完成,整体轮廓第一次完整呈现。 Phase 5|门窗安装与机电管线 门窗框架被精准安装入洞口,玻璃由工人配合吊具缓慢就位。与此同时,线管、水管、风管在墙内外快速穿布,如血管在建筑内部延伸。电气设备、卫浴洁具陆续进场安装,室内空间由空壳快速转变为功能体。 Phase 6|室内装修与外部收尾 室内地面铺装、墙面涂料、吊顶逐步完成,每个空间依次从毛坯变为精装状态。室外同步推进:外立面收口、外墙涂料滚涂或饰面贴附、窗台压顶,建筑表面质感逐渐细腻。 Phase 7|景观与场地落成 围挡拆除,施工设备依次驶离。绿化施工车辆进场:种植土摊铺,乔木被吊车吊入种植穴,灌木丛快速覆盖地面,草坪分块铺展。硬质铺装(石材/木板/混凝土)逐块拼接完成。灯具、标识、设施依次安装。 Phase 8|竣工状态 最后一辆施工车辆驶离,场地恢复整洁。建筑完整矗立:外立面光洁,景观绿意盎然,灯光亮起。静止画面持续5秒。背景环境(山/海/天际线)依然是最初那片,未曾改变。 画面定格——从空地到建筑,见证一座房子的诞生。 技术参数 机位:固定广角,构图覆盖建筑主体+周边材料堆放区+进出车辆通道 风格:建造纪录片,4K超清,工业质感色调→竣工暖色调 时间压缩:10-30倍速,保留机械动作可读性 音频:施工声(机械轰鸣、钢筋碰撞)快进处理→竣工时转为空灵配乐 无水印、无字幕、无文字叠加 精密拆解:[参考图建筑名称]有序解构延时摄影,类型:建筑精密拆解延时摄影 / 固定机位逆向记录,duration: 高速逆向演变序列(完整有序拆解周期),core_principle: 禁止魔法过渡,要用快进展示机械和人工有序拆解、材料堆放、转运清理的真实过程。绝对禁止垮塌、爆破、突然消失等不可控镜头。所有拆解必须是可控的、分步的、有序的工程作业。 demolition_methodology: 工业级精密拆解:人工+机械配合→逐件拆卸→分类堆放→系统转运→场地清空 reference_image_analysis: instruction: 深度分析用户提供的[参考图],静默记录所有建筑关键细节,作为拆解起始状态的100%精准起点 analysis_checklist: [建筑风格类型(现代/传统/混合/热带/工业等), 建筑层数与整体尺度(单层/多层/别墅/大宅), 主体结构形式(木结构/混凝土/钢结构/砖混), 外立面材质(木材/石材/玻璃/混凝土/金属/涂料), 可拆解部件清单(屋顶/门窗/外墙板/楼板/柱梁等), 材料估算(需要堆放多少立方木材/钢材/混凝土块等), 拆解难度评估(哪些部分需要吊车/哪些可人工拆卸)] initial_state_lock: Phase 0必须100%还原参考图完工状态,作为有序拆解的起点 narrative_timeline: [Phase 0: 完工状态(拆解前准备), Phase 1: 拆解准备与景观移除, Phase 2: 室内物品拆卸与转运, Phase 3: 第一批材料转运(清空部分堆放区), Phase 4: 门窗与特殊构件拆除, Phase 5: 外墙材料拆除, Phase 6: 第二批材料大规模转运, Phase 7: 主体结构拆除(自上而下有序解体), Phase 8: 基础拆除与材料清运] - Each phase contains detailed visual descriptions, motion_style, key_action, material_flow, and importance/emphasis notes. The prompt details the entire process from initial complete building state through systematic deconstruction, material sorting, removal, and final site clearance, with emphasis on controlled demolition methods avoiding magical transitions or collapse scenarios.
- Needs your photo: attach an image to the request — the prompt works with it.
The rights to this prompt belong to its author @john87445528. You are responsible for any commercial use — promoting AI tools, aggregators or Telegram bots: mozgi.io accepts no liability. Details →











